GE Offshore and ENI – Project Management, Design and Construction Supervision of 3,000m...
Selected Feeder Roads in the Awutu – Effutu District of the Eastern Region under the Village...
Affordable housing Project at Koforidua
Presidential Complex – Flagstaff House
Affordable housing Project at Borteym...
Provision of residential accommodation and other services for the Ghana Police Service under the Ministry of Interior..…
Asphaltic Overlay of Selected Roads in Kumasi
On Shore Base Construction inTakoradi Habour for GE Offshore
On Shore Base Construction inTakoradi Habour for GE Offshore
On Shore Base Construction inTakoradi Habour for GE Offshore
Emergency protection of Weija Catchment including of 51 km perimeter fencing, road works
Double Cell 3m X 3m U-Culvert on the Krakrom – Atakona Foad in the Bron-Ahafo Region
Double Cell 3m X 3m U-Culvert On The Krakrom – Atakona Foad In The Bron-Ahafo Region
Geotechnical Investigations on Tema Akosombo Railway Line
Double Cell 3m X 3m U-Culvert on the Krakrom – Atakona Foad in the Bron-Ahafo Region
Double Cell 3m X 3m U-Culvert On The Krakrom – Atakona Foad In The Bron-Ahafo Region
Geotechnical Investigations on Tema Akosombo Railway Line
Geophysical Surveys on Ayi Mensah – Peduase Road Slopes
Double Cell 3m X 3m U-Culvert On The Krakrom – Atakona Foad In The Bron-Ahafo Region
Ayensu Starch Factory
Ayensu Starch Factory
Medium Scale Garment Factory At Export Processing Zone – Tema
Medium Scale Garment Factory At Export Processing Zone – Tema
Cassava Alcohol Processing Plant for Caltech Ventures
Medium Scale Garment Factory At Export Processing Zone – Tema
Royal Golf Views Kumasi
Presidential Enclave at North Ridge Accra
Ministry of Education (FPMU/GETFund) | Design and Construction Supervision of Science Blocks, Creative Arts Blocks, Libraries, Administration Blocks, Assembly Halls, Dormitories and Staff Accommodation for New and Existing Senior Hight Schools in the newly created Ahafo Region | September 2019 to Date |
Department of Urban Roads | Asphaltic Overlay of Selected Roads in Kumasi Metropolis (50.00 Km) | January 2019 to Date |
Khato Civils of South Africa and Ministry of Roads and Highways | Feasibility Studies for the Dualization of the Accra Kumasi Road responsible for all geotechnical and Geodetic Surveys, Hydrological and Environmental, Social Impact Assessments, Traffic Analysis and Bridge Design | August 2018 - Date |
Griner International and Ministry of Roads and Highways | Feasibility Studies for the construction Ankobra, Eture and Dikpe Bridges responsible for all geotechnical and Geodetic Surveys as well as Hydrological and Environmental, Social Impact Assessments | April 2018 - Date |
Afcons Engineering/Ministry of Railways Development | Materials Survey and Geotechnical Engineering for 85km Tema – Akosombo Railway Line | March 2017 to date |
CDP Ventures Estate Developers | Project Management, Design and Construction Supervision of 17 acres of Infrastructure for Services Plots at Community 24 Tema | December 2015 to Date: |
Metka Engineering Ltd/Ministry of Energy | Review and certification of Civil Engineering Documentation for 300mW power plant and associated structures in Tema | January 2017 to March 2017 |
Pleasant Properties Ltd | Project Management, Design and Construction Supervision of 4 blocks of 6 storey apartments covering 12,000m2 overlooking the Kumasi Royal Golf Course | December 2014 to Date |
Enterprise Insurance Ltd | Structural design and Construction Supervision of 1,500m2 funeral homeat Hatso Accra | July 2015 to October 2016 |
GE Offshore and ENI | Project Management, Design and Construction Supervision of 3,000m2 by 20m high workshop, 600m2 welfare block and 7000m2 laydown area within the Takoradi Harbour | April 2015 to September 2016 |
Caltech Ventures Ltd | Project Management, Design and Construction Supervision of 10,000 litre per day Ethanol Plant at Hodzo, Volta Region | August 2014 to June 2016 |
Genesis Oil and Gas Services | Project Management, Design and Construction Supervision of 20 Acre Logistics Base at Apowa in the Western Region | April 2014 to Feb 2015 |
Ghana Highway Authority | Detailed Engineering Studies Slope stability investigation Ayi Mensah to Peduase | February 2013 to April 2013 |
The Melcom Group | Structural Integrity Assessment of 15 Shopping outlets | November 2012 to Date |
Chateaux Homes Ltd | Structural Engineering Construction Supervision of 6- Storey Apartment Block at Airport Residential Area | October 2012 to Date |
Ghana Highway Authority | Detailed Engineering Studies Slope stability investigation Ho – Fume road | January 2013 to March 2013 |
Beaufort Properties | Local Engineering Consultant North Ridge apartments | May 2012 to December 2012 |
Sethi Brothers | Local Engineering Consultant Affordable Housing Project at Kpone | April 2012 to November 2012 |
Harry Ahenkora Marfo | Detailed Engineering Design for 6 storey, 800m2 commercial facility Harriman Plaza at the Banking Enclave in Tema Community 1 | March to November 2012 |
Villa Montechello Hotel | Detailed design Expansion of Villa Montechello Hotel, Airport Residential Area. | June 2012 to December 2012 |
First Deep Water Discoveries Ltd. | Topographic Surveys, Geotechnical Investigation and Structural Design as well as foundation Design for the development of a 6 Acre tank farm in the Tema Industrial Area | January – June 2011 |
Sage Petroleum Ltd | Topographic Surveys and Geotechnical Investigation as well as foundation Design for the development of a 6 Acre tank farm in the Tema Industrial Area | January – February 2011 |
SIC Life Insurance | Geotechnical Investigation for SIC Life - Multi Storey Office complex on the Kanda Highway | November 2010 to February 2011 |
Bank of Ghana | Geotechnical Engineer for Bank of Ghana Vault and Currency Processing center on the Spintex Road | October to November 2010 |
Standard Chartered Bank | Geotechnical Investigation- Multi Storey Office complex at Liberia Rd. Branch, Accra | August to September 2010 |
Standard Chartered Bank | Geotechnical Engineer for the construction of multi- storey office Block for the Standard Chartered Bank at the Liberia road Branch | August to September 2010 |
Ministry of Interior | Project Management: Preparation of Project documentation for the provision of residential accommodation and other services for the Ghana Police Service under the Ministry of Interior | February 2009 to August 2010 |
Ministry of Trade and Industries | Infrastructure Engineering in Preparation of Feasibility Study and Development of Business Plan for Furniture City at Export Processing Zone for the Ministry of Trade and Industries | July 2008 to July 2009 |
Ministry of Water Resources Works and Housing | Project Management Emergency protection of Weija Catchment including Community Consultation Boundary confirmation and Construction Supervision of 51 km perimeter fencing, road works and associated drainage structures and waterway management for the Ghana Water Company Ltd | January 2008 to July 2008: |
Ministry of Presidential Affairs. | Project Management for the Design and Construction Supervision of 30 No. Villas and associated infrastructure at North Ridge Accra to host the Heads of State for the 9th AU summit in Accra | December 2006 to July 2007 |
Ministry of Roads and Highways | Design and Supervision – STABEX Feeder Roads Project Financed by the European Union Detailed pavement study including materials investigation for all materials to be incorporated into permanent works. Designed pavements for all the roads 226 Km of feeder roads and supervision of works. | January 2004 – December 2007 |
Ministry of Roads and Highways | Materials/Geotechnical Engineer – Affordable housing P r o j e c t at Koforidua Detailed pavement study, including materials investigation for all materials to be incorporated into permanent works. Designed pavements and drainage for all the roads for the Ministry of Water Resources Works and Housing | February to May 2007 |
Ministry of Presidential Affairs | Materials/Geotechnical – Presidential Complex – Flagstaff House Detailed pavement study including materials investigation for all materials to be incorporated into permanent works as well as Geotechnical Investigation and Topographic survey. | January to April 2005 |
Ministry of Water Resources Works and Housing | Materials/Geotechnical – Affordable housing Project at Borteyman Detailed pavement study including materials investigation for all materials to be incorporated into permanent works. Designed pavements for all the roads. | January to April 2005 |
Ministry of Roads and Highways | Detailed engineering design and feasibility studies- Selected roads within the Sekondi/Takoradi Metropolis-Department of Urban Roads (projects financed by IDA) | May 2003 – December 2004 |
Ministry of Roads and Highways | Project management, design and construction supervision –Detailed Design and Construction Supervision of 40km of selected Feeder Roads in the East Akim District of the Eastern Region under the Village Infrastructural Project. | January 2002 – June 2003 |
Ministry of Trade and Industries | Project management, design and construction supervision, President’s Special Initiative on Garments and Textiles involving the construction of 10,000m2 of factory space | June 2002 – February 2003 |
Ministry of Roads and Highways | Engineering studies for input into determining the feasibility of developing the Accra-Tema Motorway phases II and III and the Nkrumah Circle-Achimota roads on a BOT basis in conjunction with Consuit4 (PTY) of South Africa. | January 2002 – June 2003 |
Ministry of Roads and Highways | Engineering studies on the Accra-Tema Motorway, Tema – Akosombo, Kumasi-Mampong, Kintampo- Tamale and Sunyani-Berekum, roads for development of tolling plazas in conjunction with Intertoll International of South Africa. | January1999 – June 2000 |
Ghana Civil Aviation Authority | Materials/Pavement Engineer Central Regional development Corporation Cape-Coast Airport Detailed pavement study including materials investigation for all materials to be incorporated into permanent works. Designed pavements for the runway, taxiway apron and access road | June 1998 – November 1998 |
Ghana Civil Aviation Authority | Materials/Pavement Engineering design for Ghana Civil Aviation Authority Ho Airport Detailed pavement study including materials investigation for all materials to be incorporated into permanent works. Designed pavements for the runway, taxiway apron and access road | January 1997 - June 1997 |
Empire Builders | Project Management including Design and Supervision of a 400 acre Executive Housing estate for Empire Builders at Adjiringano. (Trasacco Valley) Responsible for planning, design and contract administration of all road works, water distribution and sewage disposal. | October 1995 to January 1997 |
Anglo Gold Ashanti | Project Management including Design and Supervision Project management for the Infrastructural works for 150 housing units (Precious Fields Estate) for the Ashanti Goldfields Corporation | February 1993 to October 1995 |
Assignment Name: Design and Construction Supervision of Science Blocks, Creative Arts Blocks, Libraries, Administration Blocks, Assembly Halls, Dormitories and Staff Accommodation for New and Existing Senior Hight Schools in the newly created Ahafo Region |
Approx. value of the contract (in current US$ or Euro): USD 20,000,000.00 |
Country: Ghana Location within Country: Mim, Kukuom, Akrodie, Bechem, Techimantia |
Duration of assignment (months): 24 months |
Name of Client: Ministry of Education |
|
Address: Ministries Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 500,000.00 |
Start date: September 2019 Completion date: September 2020 | N° of professional staff-months providedby associated Consultants: N/A |
Name of associated Consultants, if any: N/A | Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere, Team Leader, Kweku Solomon, Materials Engineer Evans Asomah, Quantity Surveyor, Henry Gyampo, Geodetic Engineer |
Narrative description of Project:Design and Construction Supervision of Science Blocks, Creative Arts Blocks, Libraries, Administration Blocks, Assembly Halls, Dormitories and Staff Accommodation | |
Description of actual services provided by your staff within the assignment:Design and Construction Supervision | |
Assignment Name: Construction Supervision of Asphaltic Concrete Overlay of Selected Roads in Kumasi (50km) |
Approx. value of the contract (in current US$ or Euro): USD 30,000,000.00 |
Country: Ghana Location within Country: Kumasi |
Duration of assignment (months): 24 months |
Name of Client: Department of Urban Roads |
Total N° of staff-months of the assignment: 115 man months |
Address: Ministries Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 400,000.00 |
Start date: January 2019 Completion date: January 2020 |
N° of professional staff-months provided by associated Consultants: N/A |
Name of associated Consultants, if any: N/A | Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere, Team Leader, Kweku Solomon, Materials Engineer Evans Asomah, Quantity Surveyor, Henry Gyampo, Geodetic Engineer |
Narrative description of Project: Asphaltic Concrete Overlay of Selected Roads in Kumasi (50km) |
|
Description of actual services provided by your staff within the assignment: Construction Supervision | |
Assignment Name: Feasibility Studies for the Ankobra, Eture and Dikpe Bridges |
Approx. value of the contract (in current US$ or Euro): USD 155,000,000.00 |
Country: Ghana Location within Country: Central, Western and Upper East Reg |
Duration of assignment (months): Five months |
Name of Client: Griner International/Ministry of Roads and Highways |
Total N° of staff-months of the assignment: 35 man months |
Address: The Octagon, Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 98,000.00 |
Start date: April 2018 Completion date: September 2018 |
N° of professional staff-months provided by associated Consultants: N/A |
Name of associated Consultants, if any: N/A | Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere, Team Leader |
Narrative description of Project: Construction of over 500m of Bridges |
|
Description of actual services provided by your staff within the assignment: Geotechnical, Geodetic, Hydrological an Materials Investigation as well as ESIA |
|
Assignment Name: Feasibility Studies for the Dualization of the Accra Kumasi Road |
Approx. value of the contract (in current US$ or Euro): USD 5,500,000,000.00 |
Country: Ghana Location within Country: Grt Accra, Eastern Ashanti Regions |
Duration of assignment (months): Twelve months |
Name of Client: Khato Civils of South Africa/Ministry of Roads and Highways |
Total N° of staff-months of the assignment: 255 man months |
Address: Unit 13 Midway Industrial Park, Samrand Ave. Kosmosdal Centurion |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 4,200,000.00 |
Start date: August 2018 Completion date: August 2019 |
N° of professional staff-months provided by associated Consultants: N/A |
Name of associated Consultants, if any: N/A | Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere, Team Leader |
Narrative description of Project: Dualization of 230km of road including 26 interchanges and 19 bridges |
|
Description of actual services provided by your staff within the assignment: Geotechnical, Geodetic, Hydrological an Materials Investigation, Bridge and Interchange Design as well as ESIA and Traffic Assessment |
Assignment Name: Materials Survey and Geotechnical Engineering for 85km Tema – Akosombo Railway Line |
Approx. value of the contract (in current US$ or Euro): USD 385,000,000.00 |
Country: Ghana Location within Country: Tema to Akosombo |
Duration of assignment (months): Nine months |
Name of Client: Afcons Engineering/Ministry of Railways Development |
Total N° of staff-months of the assignment: 153 man months |
Address: Afcons House, 16 Shah Industrial Estate Andheri (West) Mumbai 400053 |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 560,000.00 |
Start date: March 2017 Completion date: Dec. 2017 |
N° of professional staff-months provided by associated Consultants: N/A |
Name of associated Consultants, if any: N/A | Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere, Team Leader |
Narrative description of Project: Construction of 85 km Railway line from Tema to Akosombo |
|
Description of actual services provided by your staff within the assignment: Geotechnical Engineering and Materials Investigation |
|
Assignment Name: Review and certification of Civil Engineering Documentation |
Approx. value of the contract (in current US$ or Euro): USD350.0m |
Country: Ghana Location within Country: Tema |
Duration of assignment (months): 3 months |
Name of Client: Metka Engineering Ltd |
Total N° of staff-months of the assignment: Three man months |
Address: 8 Artemidos str, GR-15125 Maroussi, Athens, Greece |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): UDS 65,000.00 |
Start date: January, 2017 Completion date: March, 2017 |
N° of professional staff-months provided by associated Consultants: N/A |
Name of associated Consultants, if any: N/A | Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere, Team Leader |
Narrative description of Project: Installation of 300mW power plant and associated structures in Tema |
|
Description of actual services provided by your staff within the assignment: Review and certification of structural and civil engineering drawings |
Assignment Name: Project Management, Design and Construction Supervision of ON Shore Logistics Base |
Approx. value of the contract
(in current US$ or Euro): USD 12.0m |
Country: Ghana Location within Country: Takoradi Harbour |
Duration of assignment (months): Eighteen Months |
Name of Client: GE Offshore Ltd |
Total N° of staff-months of the assignment: 126 man months |
Address: 3rd floor, Stanbic Heights Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 350,000.00 |
Start date: April, 2015 Completion date: September 2016 |
N° of professional staff-months provided
by associated Consultants: N/A |
Name of associated Consultants, if any: N/A |
Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere, Project Manager |
Narrative description of Project: Construction of Onshore Logistics Base and X’Tree fabrication facility including of 3,000m2 by 20m high workshop, 600m2 welfare block and 7000m2 laydown area within the Takoradi Harbour |
Description of actual services provided by your staff within the assignment: Structural, Civil, Electrical, Mechanical, Geotechnical and Geodetic Engineering Design, EIA as well as Construction Supervision |
Assignment Name: Slope stability Investigation and detailed engineering |
Approx. value of the contract
(in current US$ or Euro): USD 5.0m |
Country: Ghana Location within Country: Ayi Mensah to Peduase |
Duration of assignment (months): 3 months |
Name of Client: Ghana Highway Authority |
Total N° of staff-months of the assignment: 10 man months |
Address: Technology House, Ministries Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 60,000.00 |
Start date: February 2013 Completion date: April 2013 |
N° of professional staff-months provided
by associated Consultants: N/A |
Name of associated Consultants, if any: N/A |
Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere, Team Leader |
Narrative description of Project: Incorporation of rock fall nets for stabilization of slopes |
|
Description of actual services provided by your staff within the assignment: Geotechnical Investigation, Geophysical Studies and detailed engineering. |
|
Assignment Name: Slope stability Investigation and detailed engineering |
Approx. value of the contract
(in current US$ or Euro): USD 4.0m |
Country: Ghana Location within Country: Ho to Fume |
Duration of assignment (months): 3 months |
Name of Client: Ghana Highway Authority |
Total N° of staff-months of the assignment: 10 man months |
Address: Technology House, Ministries Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 45,000.00 |
Start date: January 2013 Completion date: March 2013 |
N° of professional staff-months provided
by associated Consultants: N/A |
Name of associated Consultants, if any: N/A |
Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere, Team Leader |
Narrative description of Project: Incorporation of rock fall nets for stabilization of slopes |
|
Description of actual services provided by your staff within the assignment: Geotechnical Investigation, Geophysical Studies and detailed engineering. |
|
Assignment Name: Project Management, Design and Construction Supervision of 20 Acre Logistics Base |
Approx. value of the contract
(in current US$ or Euro): USD 14.0m |
Country: Ghana Location within Country: Apowa, Western Region |
Duration of assignment (months): 10 months |
Name of Client: Genesis Oil and Gas Ltd |
Total N° of staff-months of the assignment: 55 man-months |
Address: 27 Duchessville, 2nd Circular Road, Cantonments, Accra, Ghana |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 125,000.00 |
Start date: April 2014 Completion date: February 2015 |
N° of professional staff-months provided
by associated Consultants: N/A |
Name of associated Consultants, if any: N/A |
Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere, Project Manager |
Narrative description of Project: Construction of Roads, Water and Electricity Supply, Sewerage and Fabrication facilities |
|
Description of actual services provided by your staff within the assignment: Structural, Civil, Electrical, Mechanical, Geotechnical and Geodetic Engineering Design, EIA as well as Construction Supervision |
Assignment Name: Detailed Engineering Design for 6 Acre tank farm |
Approx. value of the contract
(in current US$ or Euro): USD 5.0m |
Country: Ghana Location within Country: Tema |
Duration of assignment (months): Six months |
Name of Client: First Deep Water Discovery |
Total N° of staff-months of the assignment: 14 man months |
Address: Ocean House, 13A Yiyiwa Drive, Abelekpe, Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 42,000.00 |
Start date: January 2011 Completion date: June 2011 |
N° of professional staff-months provided
by associated Consultants: N/A |
Name of associated Consultants, if any: N/A |
Narrative description of Project: Construction of Tank farm for finished petroleum products including linking to pipeline to harbour |
Description of actual services provided by your staff within the assignment: Topographic Surveys, Geotechnical Investigation and Structural Design as well as foundation Design | |
Assignment Name: Detailed Engineering Design for 6 Acre tank farm |
Approx. value of the contract
(in current US$ or Euro): USD 2.0m |
Country: Ghana Location within Country: Tema |
Duration of assignment (months): Two months |
Name of Client: Sage Petroleum |
Total N° of staff-months of the assignment: 5 man months |
Address: C135/21 Agama Road, Abelemkpe Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 21,000.00 |
Start date: January 2011 Completion date: February 2011 |
N° of professional staff-months provided
by associated Consultants: N/A |
Name of associated Consultants, if any: N/A |
Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere |
Narrative description of Project: Construction of Tank farm for finished petroleum products |
|
Description of actual services provided by your staff within the assignment: Topographic Surveys, Geotechnical Investigation and Structural Design as well as foundation Design |
|
Assignment Name: Infrastructure Engineering in Preparation of Feasibility Study and Development of Business Plan for Furniture City at Export Processing Zone |
Approx. value of the contract
(in current US$ or Euro): USD 10.0m |
Country: Ghana Location within Country: Tema Export Processing Zone |
Duration of assignment (months): 12 Months |
Name of Client: Ministry of Trade and Industries |
Total N° of staff-months of the assignment: 72 man months |
Address: PMB, Ministries Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 150,000.00 |
Start date: July, 2008 Completion date: July, 2009 |
N° of professional staff-months provided
by associated Consultants: N/A |
Name of associated Consultants, if any: N/A |
Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere Team Leader |
Narrative description of Project: Development of an Industrial Park within the Export Processing Zone |
|
Description of actual services provided by your staff within the assignment: Infrastructure Engineering in Preparation of Feasibility Study and Development of Business Plan for Furniture City at Export Processing Zone |
Assignment Name: Project Management Emergency protection of Weija Catchment including Community Consultation Boundary confirmation and Construction Supervision of 51 km perimeter fencing, road works and associated drainage structures and waterway management for the Ghana Water Company Ltd |
Approx. value of the contract
(in current US$ or Euro): USD 8.0m |
Country: Ghana Location within Country: Weija |
Duration of assignment (months): Six months |
Name of Client: GWCL/Ministry of Housing and Water Recourses |
Total N° of staff-months of the assignment: 18 man months |
Address: PMB, Ministries, Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 54,000.00 |
Start date: January 2008 Completion date: July 2008 |
N° of professional staff-months provided
by associated Consultants: N/A |
Name of associated Consultants, if any: N/A |
Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere |
Narrative description of Project: Emergency protection of Weija Catchment including Community Consultation Boundary confirmation and Construction Supervision of 51 km perimeter fencing, road works and associated drainage structures and waterway management for the Ghana Water Company Ltd |
|
Description of actual services provided by your staff within the assignment: Topographic Surveys, Geotechnical Investigation as well as Structural and Pavement Design |
|
Assignment Name: STABEX Feeder Roads Project Financed by the European Union |
Approx. value of the contract
(in current US$ or Euro): USD 17.0m |
Country: Ghana Location within Country: Ashanti and Brong-Ahafo Regions |
Duration of assignment (months): 48 Months |
Name of Client: Ministry of Roads and Highways |
Total N° of staff-months of the assignment: 376 man months |
Address: PMB, Ministries Accra |
Approx. value of the services provided by your firm under the contract (in current US$ or Euro): USD 960,000.00 |
Start date: Jan, 2004 Completion date: December, 2007 |
N° of professional staff-months provided
by associated Consultants: N/A |
Name of associated Consultants, if any: N/A |
Name of senior professional staff of your firm involved and functions performed: Leslie Awere-Kyere Team Leader |
Narrative description of Project: Construction of 226 Km of feeder roads in the Cocoa growing areas of the Brong-Ahafo and Ashanti Regions of Ghana |
|
Description of actual services provided by your staff within the assignment: Detailed engineering studies including materials investigation, geodetic and geotechnical studies, drainage design.. |